5 Steps To Size, Design & Install Glass Block Showers - home desing & remodeling

Understanding how to develop the right size shower base and shower walls with glass blocks does not need to be some mysterious process. If you’ll follow the steps in this article you’ll have an easy to clean, structurally sound, and unique shower you can enjoy in your home or commercial property for years to come.

 Home Design and Remodeling :
 
Step 1) What type of glass block shower do you want?

There are basically two types of showers you can use - a shower without a door, and a shower with a door. Here’s an overview of where to use both:

A) Showers without a door (walk in and roll in showers) – Door-less showers have become hot in bathroom design over the last 5 years. The two most popular types of these showers are walk in and roll in showers. The biggest advantage of walk in showers is you can eliminate the cost of the shower door and having to bend over to clean around the door’s framing system. The roll in shower also does not have a door, but also eliminates the curb around the base that someone has to step over to get into the shower. This makes the shower much more accessible to those with special needs. The roll in shower base is gradually sloped in towards the drain. The biggest disadvantages of the doorless showers is their bases (or platforms) need to be sized larger.

B) Showers with a door (neo angle or corner showers) – Most showers have doors to prevent water from splashing out. A popular type of shower enclosure is a neo angle variety that is placed in the corner of a bathroom to conserve space. The advantage of a shower enclosure system with a door is that it can fit into tighter spaces (these showers can be as small as 32” or 36”).

Step 2) What type of glass block shower base do you want? How do you size this base and design it out at your project site?

There are two generic types of shower bases available for block – (1) the preformed base and (2) the custom concrete base.

• The preformed base is created and sized before it is brought to the job site and can be made out of acrylic, cultured marble, or other solid surface materials. It is generally thought to cost less than a custom base, which is often true, but not always. The biggest advantage of these types of systems is they are built as one solid unit to minimize the concern about water leakage through the base. The biggest disadvantage is their size cannot be adjusted at the job site. Pittsburgh Corning makes an acrylic right or left hand entry walk in glass block shower base measuring 72” x 51”, a Neo Angle shower measuring 51” x 51”, a Square corner shower measuring 48” x 48” and even an acrylic shower base 60” x 32” that can be used to convert a small existing tub space into a new contemporary shower!

• The custom concrete or mud set pan base is sized at the new home, remodeling, or commercial building site. Since glass block cannot be cut like tile, you’ll need to use layout cards that correspond to the size of the block units to make sure the custom base you’ll make will match up with the specific block sizes for your design. Most of the layout cards are approximately 4” wide (3 7/8” is the exact size) to accommodate for the most common thickness of block used for showers. The other base thickness is 3 1/8” wide, although design options with this thickness series are more limited.

Step 3) Choosing the right sizes, shapes, and colors to make your glass block shower cool and unique.

• There are a wide selection of block sizes, patterns, shapes, colors and even artistically designed murals available for your shower. Here’s a brief overview of your options:

o Sizes and thicknesses of glass blocks for showers – Glass masonry units are made is both metric and American sizes. Most of the blocks available in the United States are American sized. The American sized blocks are available in 4” x 8”, 6” x 6”, 6” x 8”, 8” x 8”, and 12” x 12”. Specialty shapes can help you turn corners, make 45 degree neo angle showers, create rounded or radius walls if you’re looking to make a walk in or roll in shower, or finish off the end of the shower wall with a smooth bullnose look. The blocks have nominal sizes meaning the actual size of the block units is ¼” smaller allowing for a mortar joint to adhere the block to one another (an 8” x 8” block actually measures 7 ¾” x 7 ¾”). The blocks for showers are 3” and 4” thick. Thinner block (3 1/8”) are more cost effective, but shower design options are much more limited in this thickness of block.

o Patterns, designs and colored glass blocks – Blocks come in a multitude of patterns providing different levels of privacy, style, and design options. The block are now available in standard and custom colors, tints, and artistically decorated murals to match any interior design style. Check out a comprehensive block web site to see the possibilities.

Step 4) How tall should you make your glass block shower? What do you need to do to make it structurally sound? Most block showers are built on a curb (with the exception of the roll in shower) which is 4” to 5” in height. Since many shower heads are placed 84” above the finished floor consider building your glass block wall 80” tall (this will make the size of your glass block wall + the size of your base equal to the height of your shower head). To make the glass shower walls structurally sound they should be tied into side walls with anchors every third coursing of block (usually this is every 24”).

Step 5) Don’t worry about any of the first 4 steps and call a glass block shower supplier and installation professional – If you really don’t want to figure out what size, shape, and shower base is best call a block specialty company who offers design, supply and installation services. This type of company will usually come to your home or business (without a charge), measure your shower space, figure out the possible types of bases and showers for you, and install it with a guarantee.

Custom Motorhome Interior Design

Home Design and Remodeling - When it comes to creating a custom interior design for your home on wheels the possibilities are endless! When considering a home remodel or renovation the first step is to talk to a contractor who understands buildings codes and local regulation. Likewise, when you decide it’s time to give your motorhome or RV a new face, the best option is to contact someone with years of experience in custom RV renovation.

Time to Renovate:
Now that you’ve made the big decision to keep the RV that’s taken you on so many great trips and created so many amazing memories, you’ll need to make a plan of action for remodeling. Three of the biggest components to any remodel are floors, cabinets, and furniture. By updating any or all of these items you will drastically alter the appearance of your RV.

RV’s can be fitted with beautiful wood flooring that will look just as good in your RV as it does in your kitchen at home. For those who prefer tile, that’s no problem at all! All types and patterns of tile can be installed whether it be sleek modern look or a floor fit for a king, you decide how grand the appearance.

Next on the list to be remodeled are cabinets and furniture. Undoubtedly technology has changed substantially over the past few years. This means that there is a good chance that your RV is sporting a TV that isn’t quite up to par with today’s standards. By remodeling your cabinets you will not only be able to fit a new flat screen TV, but will simultaneously create more cabinet space! There are just as many options for furniture. You can choose to reupholster your existing furniture, or outfit your RV with all brand new seats to match your new floors and cabinets!

Installation:

Picking out all of the new materials that you wish to use in renovating your RV is the easy part! Installing floors, cabinets, and furniture will most likely be a lot more work than you will want to tackle by yourself. The best way to ensure that your new custom items are safely and properly secured is to have a professional service complete the work. Those who set out to do the work themselves on a Saturday morning may find themselves a little discouraged at how daunting the work load can be. If you want something done right, have a professional do it! You have come too far to cut corners now, so make sure to have your new custom interior completed by a qualified professional.

10 Tips On Managing Your Home Renovation Project.


Home Design and Remodeling - When planning your home remodeling or renovation project one of the main decisions you need to make is who will manage the project. You may have engaged a Designer, and add managing the project to their contract. Alternatively, as is common practice, the main builder may act as the Contracting Manager. Or you may decide to take on the project management role yourself.

Designing a building or renovation is not just about how it will look and function but also what materials are used, when they are needed, ensuring payments are made to suppliers and subcontractors, and quality assurance. If you feel you have the experience to deal with this, great. But be warned, it's not as easy as it may sound. Contracting your own home result in savings of up to 20 percent but can end up costing you more than if you contracted out, if delays, poor engagement and low quality results.

The 10 most common mistakes made by homeowners acting as remodeling and renovation project managers are:

1. Insufficient Planning - the success of your project is probably 80 contingency to allow for alternative materials, increased costs, higher cost for replacement labor etc. It is so easy for $40 here and $25 there to become $3000 over a two or three week project. This is why it is so imperative to update your expenditure every single day so you know exactly where you are. There is nothing that will stop a building project in its tracks faster than subcontractors fear of not getting paid.

2. Poor Materials Management - Time and Materials planning is a big task but it can be very costly not having the right materials in the correct quantity at the right time. In large projects you will engage a quantity surveyor to estimate the material requirements. Some may add a time element to your material requirements plan, otherwise you need to work closely with your builder and supplier to ensure that lead times are built into the delivery scheduling of materials to avoid delays.

3. Not Planning Sufficiently For Contingencies - materials can become unavailable due to warehouses burning down, transport strikes, import problems and even short supply being given to a more valued customer. Labour can become unavailable due to illness, injury or overrun on previous jobs. You need to have contingency plans to manage this and understand the impact of an alternative choice of materials in terms of the support structure required and finishing. Remember - What is possible in six weeks, on average takes ten weeks and in a worst-case scenario could be twelve to fifteen weeks. You need to be able to reschedule to meet these types of delays.

4. Poor Record Keeping - keep and file everything, and keep records well organised. Your finance provider will most likely require proof of completion at each stage and a summary of expenditure to date, before releasing the next progress payment. If not using finance, good record keeping is just good management. You need to know exactly where you are in terms of time and dollars against the plan specification. This should be the final task you do each night.

5. Not Managing The Worksite - there are a number of regulations and workplace safety items that need to be covered during any building project. When trying to keep costs down it is tempting to throw caution to the wind and avoid the cost of indemnity insurance for destruction or property and for injury to those working on and visiting the site. If you do, you are a fool - and any builder or subcontractor who works on a site without ensuring these things are in place, are also foolish. Ensure that your subcontractor agreements make them responsible for safety and insurance of their area of work.

6. Slack Quality Assurance - use a work-check- approve-work cycle on every stage of the project. The three most critical parts of the project from a QA perspective are the foundations, framing and services. The foundations are the base upon which every other part of the design specification relies. Get this wrong and the problems start snowballing. QA is one task that should NEVER be rushed through or passed over when under time pressure. The downline impacts are too great.

7. Poor Subcontractor Management - one benefit of using a builder as the project manager is that they have a network of trusted subcontractors. In a full home renovation, there can be 20-30 subcontractors. You need to use a well planned system for engaging, qualifying, contracting and managing your subcontractors. And remember to check and sign off their work BEFORE they leave the site and certainly before you pay them. You may like to engage an independent building consultant to manage these inspections.

8. Poor Communication - Act professionally, it gives subcontractors more confidence that the project will be well managed. Let everyone involved with the project know what you are expecting from them in terms of deliverables and quality. Even with the most detailed plan, inevitably things will crop up that need discussion and adjustment. If all parties are not using the same lingo, it is easy for messages to get mis-communicated and misunderstood. Invest the time to learn the standard building trade terms, and if ever you are in doubt - ask for clarification. With the intensity of managing a home renovation or remodeling project, especially if its your first attempt can mean you forget to communicate to contractors and suppliers as humans. A word of thanks goes a long way; a round of cold drinks on a hot day goes even further.

9. Poor Change Management Control - this ties in with the item above. All changes should be documented and signed off, however insignificant it may seem. Builders and subcontractors are human, they make mistakes. You need to ensure that any remedy or changes resulting from those errors is agreed, documented and charged to the appropriate party. I have been in the position where a builder made a major error which could not be undone, meaning the design had to be changed to 'accommodate' the error. He then tried to charge ME an additional $8000 based on the change in design!! My change documentation saved me in Court.

10. Not Keeping Check Of The Budget - although this is part of record keeping and contingency planning, it is worth a mention as the final item on our top 10 list. All project will overrun the initial estimate. It is normal practice to add 15% contingency to allow for alternative materials, increased costs, higher cost for replacement labor etc. It is so easy for $40 here and $25 there to become $3000 over a two or three week project. This is why it is so imperative to update your expenditure every single day so you know exactly where you are. There is nothing that will stop a building project in its tracks faster than subcontractors fear of not getting paid.